13 In which type of organization is team building likely to be most difficult?
A Functional
B Projectized
C Matrixed
D Project expediter
E Project coordinator
ans:C
14 Management of a certain building was receiving complaints about slow elevator service. The solution adopted was to add mirrors in the lobbies to reduce boredom while passengers waited. This is an example of _____ .
A Kepner-Tregoe method
B Potential problem analysis
C Decision analysis
D Creative problem solving
E None of the above 来源:www.examda.com
ans:D
15 Listening involves more than hearing sounds. The good listener
A Repeats some of the things said
B Finishes the speaker's sentences
C Writes everything down
D Nods his head frequently 
ans:A
16 In general, the best long-lasting approach to settling project conflict is the _____ approach .
A Problem solving
B Compromise
C Withdrawal
D Smoothing
E Forcing
ans:A
17 The positive value of conflict is underestimated. Properly managed, conflict is a valuable tool, particularly when
A A diversion is needed
B Conflictive situations are in their early stages and emotional involvement is low
C Conflictive situations are in their late stages and emotional involvement is high
D Conflict may cause a loss of status or position power
ans:B
18 There are hard causes of conflict (e.g. conflicting schedules) and soft causes. Soft causes are as important as hard causes. Soft causes include diversity of disciplinary expertise, _____, and the project manager's power of reward and punishment.
A Performance tradeoffs
B Ambiguity of roles
C Administrative procedures
D Determining earned value www.Examda.CoM
ans:B
19 When planning, organizing, coordinating, and controlling a project an important human resources skill or ability would be
A Building multi-disciplinary teams
B Managing conflict
C Communicating orally and in writing with all levels of personnel
D Involving senior management
E All are important
ans:E
20 The core function of the project manager is
A Systems design
B Client interfacing
C Quality assurance
D integration
ans:D

相关练习题: 

PMP认证考试练习题及参考答案(四十三) 

PMP认证考试最新练习题及参考答案汇总

精品推荐:

PMP全真试题精选

欢迎进入在线试听:项目管理网上辅导,热招中!!

更多信息请进入:项目管理海量题库  我考网项目管理论坛

上一页12下一页

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答