13 Risk mitigation is the process of _____ .
A transferring risk to another party.
B reducing uncertainty on the project
C identifying all possible risk events
D monitoring status and making adjustments
E All of the above.
ans:B
14 Risk exposure refers to _____ .
A the amount at stake.
B what might happen.
C the likelihood of something
D who is going to be held accountable
E All of the above.
ans:A
15 Risks include the following types:
A Business risk
B pure risk 来源:我考网网
C Insurable risk
D A and B
E All of the above.
ans:E
16 The ability to reduce risk is _____ to how far you have progressed through the project life cycle.
A inversely proportional
B directly proportional
C not related
D the responsibility of the risk executive
E is directly proportional to the amount at stake.
ans:A
17 Final risk quantification considers total risk impacts and _____ .
A translates the impacts into economic terms for analysis.
B concentrates on schedule impacts
C may not consider safety and environmental impacts
D A and B
E A and C 来源:考试大
ans:E
18 Risk management requires an understanding that _____ .
A the degree of greatest uncertainty occurs in the Conceptual Phase of the Life Cycle.
B risk identification must be directly aligned with the Work Breakdown Structure.
C it is merely advanced preparation for possible adverse future events.
D it does not imply complete control of events
E All of the above.
ans:E
19 "Fast-tracked" projects awarded and begun before all planning and risk assessment information is complete and available may _____ .
A be completed in reduced overall time than other projects.
B be in a higher risk category than other projects.
C not be compatible with project risk and assessment
D A and B
E All of the above.
ans:D
20 Project Risk _____ .
A should not be calculated for small projects.
B is the probability of each risk event minus the sum of the consequences of potential risk events.
C is the cumulative effect of uncertain occurrences which will adversely affect project objectives.
D cannot be quantified for first time projects.
E B or D
ans:C
相关练习题:
PMP认证考试练习题及参考答案(五十一)
PMP认证考试最新练习题及参考答案汇总
精品推荐:
PMP全真试题精选
欢迎进入在线试听:项目管理网上辅导,热招中!!
更多信息请进入:项目管理海量题库 我考网项目管理论坛
① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;
② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。