2013年职称英语综合类A类补全短文练习(1)

来源:职称英语    发布时间:2013-02-04    职称英语辅导视频    评论

  The World's Longest Bridge Rumor has it that a legendary six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. (46)When completed in 2010, the world's longest bridge will weigh nearly 300,000 tons — equivalent to the iceberg that sank the Titanic — and stretch 5 kilometers long. “That's nearly 50 percent longer than any other bridge ever built,”says structural engineer Shane Rixon.

  (47) They're suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to shoulder the structure's mammoth weight, thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,100-ton towers, which will support most of the bridge's load. The beefy cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.

  When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. (48) Getting these cables up will be something. It's not just their length — totally 5.3 kilometers — but their weight. (49)

  After lowering vertical“suspender”cables from the main cables, builders will erect a 60 meter-wide 54.630-ton steel roadway, or deck — wide enough to accommodate 12 lanes of traffic. The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons — equivalent to the weight of about 100,000 cars. Those anchors are essential. (50)

  A Some environmentalists are against the project on biological grounds.

  B What do the world's longest bridges have in common?

  C If true, one day you might spy the beast while zipping (呼啸而过) across the Messina Strait Bridge.

  D They're what will keep the bridge from going anywhere.

  E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.

  F They will tip up the scales at 166,500 tons — more than half the bridge's total mass.

  参考答案

  46. C. 47. B. 48. E. 49. F. 50. D

  小编推荐:
  2012年职称英语考试试题及答案汇总
  2012年职称英语考试成绩查询专题
  2012年中石油职称英语考试成绩查询
  2012年全国职称英语考试成绩查询汇总
  2012年军队人员全国职称英语考试成绩查询入口

  添加职称英语考试应用,试题免费做,课程免费听,考试答疑,考友交流,快来加入我们吧!

  考试工具,免费应用助学习

模拟考场
    模拟考场

章节试题
章节试题

你问我答
你问我答

资讯订阅
资讯订阅

高清课程
高清课程

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答