13 The major reason why a project manager would use written instead of oral communication is:
A documentation
B feedback
C cost
D barrier elimination 来源:www.examda.com
E All of the above.
ans:A
14 Communication in both project and non-project-driven organizations should occur in directions.
A one
B two
C three
D four
E five
ans:E
15 A project manager trying to communicate accurately to the team should use:
A the language of the team members
B the language of the project manager
C non-verbal methods
D written memos
E All of the above.
ans:A
16 The most common form of written project communication is
A Publications
B Bulletin boards
C Reports 我考网(www.Examda。com)
D Letters and memos
E All of the above
ans:D
17 For communication to occur, there must be:
A Two or more people involved
B the transmittal of information
C a communication process
D All of the above
E B and C only
ans:D
18 When subordinates know pertinent information that is not known by the project manager, the result is:
A Blindspot
B Facade
C region of influence
D Communication power base
E None of the above
ans:A
19 A line manager possesses information which the project team needs, but withholds the information. The results in a(n):
A Blindspot
B Facade
C region of influence
D Communication power base
E None of the above
ans:E
20 Non-verbal communication includes:
A Body movement
B Gestures 来源:我考网网
C Facial expressions
D The way we move our hands
E All of the above
ans:E

相关练习题: 

PMP认证考试练习题及参考答案(五十) 

PMP认证考试最新练习题及参考答案汇总

精品推荐:

PMP全真试题精选

欢迎进入在线试听:项目管理网上辅导,热招中!!

更多信息请进入:项目管理海量题库  我考网项目管理论坛

上一页12下一页

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答