PMP认证考试练习题及参考答案(十五)

来源:项目管理师    发布时间:2012-05-07    项目管理师视频    评论

1. things that distort, distract, or muddle the communication process are called:
a. noise
b. selective filtering
c. selective perception
d. medium problems
e. all of the above.http://ks.examda.com
ans: a

2. which is not a consideration in a make or buy decision?
a. cost factors (least cost alternatives)
b. competitors' method of sourcing
c. existence of sufficient administration/technical personnel
d. political and social factors
e. none of the above.
ans: b

3. a work breakdown structure:
a. assures all work is identified
b. subdivides the project into manageable segments
c. provides the project sponsor with a time-phase task summary
d. both a and b
e. all of the above.来源:考
ans: d

4. a project manager can exchange information with the project team using which media?
a. tactile
b. audio
c. olfactory
d. visual
e. all of the above.
ans: e

5. during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baseline
schedule:
a. now becomes the new schedule, including the changes, and the original baseline is disregarded.
b. is still the original baseline but annotated to reflect that a change has taken place.
c. is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
d. is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
e. is the same since baseline schedules cannot change once the development phase is completed.
ans: c

6. sensitivity analysis can be used in risk analysis to:
a. substitute for uncertainty analysis in risk quantification
b. estimate the level of risk aversion adopted by management
c. estimate the effect of change of one project variable on the overall project
d. a and b
e. all of the above.来源:www.examda.com
ans: c

7. the pareto principle is a technique used by quality managers to determine which quality control problems of a particular service or
manufacturing process should be corrected. which of the following statements represents the philosophy of the principle?
a. in order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be
corrected.
b. the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vital
few problems.
c. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
d. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financially
worthy of improvement efforts.
e. a and d
ans: b

8. the budgeted cost of the work performed (bcwp) for a task that has just been completed can be calculated by:
a. multiplying the actual hours worked on the project by the budgeted labor rate.
b. multiplying the budgeted hours to complete the task by the budgeted labor rate.
c. dividing the actual hours required to complete the task by the budgeted labor rate.
d. cannot be determined.
e. none of the above来源:考
ans: b

9. the project manager has, as a prime responsibility, to assure proper integration of activities. in which organizational form does the project
manager probably have the easiest time in integrating work?
a. matrix
b. classical
c. expediter
d. coordinator
e. pure project
ans: e

10. there are four methods of government procurement. which is not one of these methods?
a. assistance
b. sealed bidding
c. competitive proposals
d. acquisition我考网(www.Examda。com)
e. small purchases
ans: d

11. a scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. the
barriers which could hinder the lab techs. ability to filter the information include all of the following except:
a. language and semantics
b. culture and ethics
c. intelligence and knowledge base
d. reputation, authority, organizational status and position
e. relative location of the lab to the scientist's office
ans: e

12. many companies self insure against some risk. problems which can arise from self-insurance include:
a. failure to reserve funds to handle worst case scenarios (low probability events) resulting in severe financial damage to the company
b. stiff competition from insurance companies
c. confusion of business risks with insurable risks.
d. a and c
e. all of the above.
ans: d

上一页12下一页

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答