砺志PMP模拟题本周精选10

来源:项目管理师    发布时间:2012-05-07    项目管理师视频    评论

Qustions 1:
The output of scope change control consists of--

a.Scope changes, corrective action, and lessons learned
b. Corrective action, scope changes, and project plan updates
c. Performance measurement, additional planning, and lessons learned
d. Work results, product documentation, and formal acceptance

Qustions 3:

The scope statement--

a. Dose not include project objectives such as cost, schedule, or quality measures
b. Includes a description of project assumptions and constraints
c. Provides a documented basis for preparing the PERT/CPM network
d. Describes how the WBS will be structured

Qustions 5:

To relate the functional organizations to the WBS elements, the project manager should use a--

a.WBS index
b. Project WBS
c. Cost account matrix
d. Work package assignment idex

Qustions 2:
All the following are project selection methods except--

a. Logical Framework analysis
b. Analytic Hierarchy process
c. Expert judgment
d. Decision trees

Qustions 4:

The project charter should be issued by--

a. The project manager
b. The head of the performing organization
c. A manager external to the project
d. The project sponsor

Qustions 6:

Completion of project scope activities is measured against the --

a.Requirements
b.Project plan
c.Scope management plan
d.WBS

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答