RIP实现等开销负载均衡的配置

来源:思科认证    发布时间:2012-11-09    思科认证视频    评论

  实验说明:通过使用debug命令基于每个分组和每个目的地来考察等开销负载均衡。

  实验配置:

r1#sh runinterface Ethernet0 ip address 10.0.0.1 255.255.255.0!interface Serial0 ip address 192.168.1.2 255.255.255.0!router rip network 10.0.0.0 network 192.168.1.0!

r2#sh runinterface Loopback0 ip address 192.168.3.2 255.255.255.0 secondary ip address 192.168.3.1 255.255.255.0!interface Serial0 ip address 192.168.1.1 255.255.255.0 clockrate 64000!interface Serial1 ip address 192.168.2.1 255.255.255.0 clockrate 64000!router rip network 192.168.1.0 network 192.168.2.0 network 192.168.3.0!

r3#sh runinterface Ethernet0 ip address 10.0.0.2 255.255.255.0!interface Serial1 ip address 192.168.2.2 255.255.255.0!router rip network 10.0.0.0 network 192.168.2.0!

r2#sh ip routeCodes: C - connected, S - static, I - IGRP, R - RIP, M - mobile, B - BGP       D - EIGRP, EX - EIGRP external, O - OSPF, IA - OSPF inter area       N1 - OSPF NSSA external type 1, N2 - OSPF NSSA external type 2       E1 - OSPF external type 1, E2 - OSPF external type 2, E - EGP       i - IS-IS, L1 - IS-IS level-1, L2 - IS-IS level-2, ia - IS-IS inter area       * - candidate default, U - per-user static route, o - ODR       P - periodic downloaded static routeGateway of last resort is not setR    10.0.0.0/8 [120/1] via 192.168.1.2, 00:00:23, Serial0                        [120/1] via 192.168.2.2, 00:00:19, Serial1C    192.168.1.0/24 is directly connected, Serial0C    192.168.2.0/24 is directly connected, Serial1C    192.168.3.0/24 is directly connected, Loopback0

上一页123下一页

视频学习

我考网版权与免责声明

① 凡本网注明稿件来源为"原创"的所有文字、图片和音视频稿件,版权均属本网所有。任何媒体、网站或个人转载、链接转贴或以其他方式复制发表时必须注明"稿件来源:我考网",违者本网将依法追究责任;

② 本网部分稿件来源于网络,任何单位或个人认为我考网发布的内容可能涉嫌侵犯其合法权益,应该及时向我考网书面反馈,并提供身份证明、权属证明及详细侵权情况证明,我考网在收到上述法律文件后,将会尽快移除被控侵权内容。

最近更新

社区交流

考试问答