即刻加入cet3学习小组,参与学习讨论吧。 |
| 英语三级考试学习小组 | |
成员:300人 |
收到提问:124个 | |
回答问题:42个 |
Directions: The follwing is a business letter. After reading it you are required to complete the outline below it(No. 46 to No. 50). You should write your answers briefly (in not more than three words) on the Answer Sheet correspondingly.
To: Robert Williams, School of Architecture
From: James. Johnson
Subject: Air-conditioning Installation Costs for East Hall
Date: June 4, 2006
I am writing to inform you of the costs of installing air-conditioning for the seven offices and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range.The work would take .about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: 46 Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two 47
2. Possible problem: some 48 might occur during, a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. Amore powerful ____49 , is needed to handle the halls and stairways3. Additional installation postponement will result in changes in 50
考试信息:2012年6月cet3成绩查询 2012年12月cet3报名时间
·考试大会员中心:每日一练 专项题型 模拟试卷 历年真题 资讯订阅
买知识,卖知识,就上233考试大!还可以免费赚取现金哦! |
·您手头有好东西吗?上传上来和大家一起分享吧!你也可以求购你自己想要的资料。 ·上传您的精品资料,可获得收入,既可在网站上进行消费,也可提取现金。 ·若被评为最佳资料,还可以增加任务分值。了解更多>> | |